Single investment

Jméno projektu

Typ projektu

Project type

Umístění projektu

Project location

Available Investment Schemes:

Economic indicator of the project:

Total Acquisition Cost:
CZK
Project EBITDA:
CZK
Total project cost:
CZK
Minimum investment amount:
Maximum investment amount:
CZK
Estimated appreciation:
%
Name of the project:
Project type:
Project location:
Project Information Online:
Available Investment Schemes:

Economic indicator of the project:

Total Acquisition Cost:
CZK
Project EBITDA:
CZK
Total project cost:
CZK
Minimum investment amount:
Maximum investment amount:
CZK
Estimated appreciation:
%

SCORING

Project rating based on score 0 - worst | 100 best

Score Schema A

0
points

Score Schema B

0
points

Score Schema C

0
points

Overall average SCORE

0
points

Non-functional EXIT

0
points

Failure to achieve yield

0
points

% of sales area

0
%

The projects are evaluated on the basis of the calculation method where individual parts are assigned a score of 0 – 100.
0 points – or low point scores indicate significant risk in the area, High scores represent very moderate risk 100 points represent essentially zero risk. Description of Area: Timing mismatch risk represents an assessment that the project will not be implemented within the expected timescales, thus causing the project to be delayed and thus reducing the % p.a. return. | Non-Functional EXIT Strategy: The score assesses the ratio between the cost of building a unit and the sale of the worst vacant properties in the area | Failure to Achieve Yield: The score assesses the risk of a deviation in project costs or expected project yields | Total Average Score: This is the arithmetic average of the other scores.

Basic data

Information about the object

Total m2 of Floor Area Sales + Common:
Total m2 of sales area of flats, units
Total m2 of basements
Total of garage spaces
Total m2 Terraces
Inventory of costs
Acquisition costs
Construction costs
Cost of sales 3% of total sales volume
Cost of legal services 1.5%
Marketing costs 1% of the selling price
Reserve 5% of Acquisition + Construction Costs
Inventory of Revenues
Total yield Sale of flats
Total proceeds from the sale of cellars
Total proceeds from the sale of terraces
Total revenue from the sale of garage spaces 20m2=1st
Total cumulative yield

Jméno projektu

Typ projektu

Project type

Umístění projektu

Project location

Available Investment Schemes:

Economic indicator of the project:

Total Acquisition Cost:
CZK
Project EBITDA:
CZK
Total project cost:
CZK
Minimum investment amount:
Maximum investment amount:
CZK
Estimated appreciation:
%
Name of the project:
Project type:
Project location:
Project Information Online:
Available Investment Schemes:

Economic indicator of the project:

Total Acquisition Cost:
CZK
Project EBITDA:
CZK
Total project cost:
CZK
Minimum investment amount:
Maximum investment amount:
CZK
Estimated appreciation:
%

SCORING

Project rating based on score 0 - worst | 100 best

Score Schema A

0
points

Score Schema B

0
points

Score Schema C

0
points

Overall average SCORE

0
points

Non-functional EXIT

0
points

Failure to achieve yield

0
points

% of sales area

0
%

The projects are evaluated on the basis of the calculation method where individual parts are assigned a score of 0 – 100.
0 points – or low point scores indicate significant risk in the area, High scores represent very moderate risk 100 points represent essentially zero risk. Description of Area: Timing mismatch risk represents an assessment that the project will not be implemented within the expected timescales, thus causing the project to be delayed and thus reducing the % p.a. return. | Non-Functional EXIT Strategy: The score assesses the ratio between the cost of building a unit and the sale of the worst vacant properties in the area | Failure to Achieve Yield: The score assesses the risk of a deviation in project costs or expected project yields | Total Average Score: This is the arithmetic average of the other scores.

Basic data

Information about the object

Total m2 of Floor Area Sales + Common:
Total m2 of sales area of flats, units
Total m2 of basements
Total of garage spaces
Total m2 Terraces
Inventory of costs
Acquisition costs
Construction costs
Cost of sales 3% of total sales volume
Cost of legal services 1.5%
Marketing costs 1% of the selling price
Reserve 5% of Acquisition + Construction Costs
Inventory of Revenues
Total yield Sale of flats
Total proceeds from the sale of cellars
Total proceeds from the sale of terraces
Total revenue from the sale of garage spaces 20m2=1st
Total cumulative yield

Interested in investing?

Máte zájem investovat?

Máte zájem investovat?