0 - 15 POINTS Rating
A category rated by a point evaluation 0-15 points represents an extremely low score and thus represents a significant risk of not completing the given parameter.
16 - 30 POINTS Rating
The category rated 16-30 points still represents a substandard result. Still, if the rest of the project is high quality, the poor scoring can be overlooked in its category, although we do not recommend it.
30 - 55 POINTS Rating
The category rated in the 30-55 point range is not an ideal result and in any case it is necessary to monitor and be aware of why the project got this lower point score.
55 - 65 POINTS Rating
A rating of this category 55-65 points, represents a middle-sized risk.
65 - 80 POINTS Rating
A rating of 65-80 points represents a good quality result, with a high probability of the project achieving its predicted results in its category. Most actively inflowing projects should reach ratings this high, at least in the overall average.
80 - 100 POINTS Rating
A rating of 80-100 points in the evaluated category represents outstanding results. A project with this rating is looked at as extremely safe and profitable for investments.

Other numbers in the ratings

With every sent project with potential investment to the investor, we send an analytical document called “SCORING”.
This document represents a collection of basic information, the presumption of the project’s timeline and the precondition of the returns and risks.

Projects Place

Celkové hodnocení bere v úvahu atraktivitu jednotlivých lokalit na základě dat z předcházejích projektů a kalkuluje je do bodového hodnocení rizka jako hodnoty – nedosažení předpokládaného zisku a nefunkční exit strategie

EBITDA

Every rated project has its calculated return value EBITDA. Earnings before interest, taxes, depreciation, and amortization (EBITDA) is a widely used metrics of corporate profitability. It is a calculative value that shows how much return the project should reach if it sticks to the expected parameters.

0 m

Total return

It is a capital appreciation value in % for the overall project timeline.

0 %

Additional information

Every rating includes additional information, e.g. about the composition of a given population or macroeconomic data, which could affect the project’s success. Eventually, risk ratings, which our risk evaluator spots in the given project, and is not described in the standard methodology.

Interested in investing?

Máte zájem investovat?

Máte zájem investovat?